Mitsubishi Heavy Confirms Plans for Arkansas Wind Turbine Manufacturing

Mitsubishi Heavy Industries, Ltd. (MHI) (7011.T) confirmed reports that it will build a wind turbine manufacturing plant in Arkansas.

The new plant, which will fabricate nacelles, a core component of wind turbines, is slated to begin operation in the second half of 2011 with an initial annual production capacity of 600 megawatts (MW). MHI looks to expand its share in the North American market, which it said is now in a recovery trend. The new plant will be the company’s first nacelle production plant located outside of Japan.

The new facility is to be built in Fort Smith, the second-largest city in Arkansas. It will be operated and managed by Mitsubishi Power Systems Americas, Inc. (MPSA), which is based in Florida

. Construction on an already secured site of roughly 90 acres (approx. 360,000 square meters) is slated to begin within this year.

When the plant opens, it is expected to create about 300 wind jobs. The initial manufacturing target will be near 250 units of 2.4-megawatts (MW) wind turbines per year, with scale to be expanded incrementally thereafter. MHI will also consider launching longer-blade type turbines for low wind-speed applications.

In conjunction with the plant construction project, the Arkansas state and Fort Smith municipal governments will provide incentive measures, complementing IRS 48C Advanced Energy Project Tax Credit.

The nacelle, which is located at the top of the wind turbine tower and functions to convert wind energy to electric power, consists of the wind turbine rotor axis, generator, multiplying gearbox, control system and electrical equipment.

MHI has engaged in the development, manufacture and marketing of wind turbines for three decades, and is Japan’s largest wind turbine manufacturer. To date MHI has delivered more than 3,500 units to the US market.

MHI already has a turbine blade manufacturing plant serving the US market: VienTek, LLC, located in Mexico.

The American Wind Energy Association (AWEA) this week released its 2009 annual report.

Website: [sorry this link is no longer available]     
(Visited 76,811 times, 2 visits today)

Comments on “Mitsubishi Heavy Confirms Plans for Arkansas Wind Turbine Manufacturing”

Post Your Comment

Your email address will not be published. Required fields are marked *